Our goods are applied in numerous fields. Our AdvantagesProducts Large quantity in Stock, No MOQ essential We comply with all the international expectations, this kind of as ISO9001 and TS16949 specifications. A lot more importantly, we make unique areas according to supplied drawings/samples and warmly welcome OEM inquiries.
INTRODUCTION:
The defining characteristic of EPT and Clamp Scaffolding is its versaEPTTty. You can use clamps to hook up horizontal tubes and vertical tubes in unlimited combos. Simply because of this adaptability, EPT and Clamp Scaffolding enhance the ringlock scaffolding in many approaches. Some of the much more common apps incEPTT:
- EPTing Ringlock baEPTTtogether
- Producing building ties to suspend scaffold
- Bracing Ringlock scaffolds
- Closing gaps in platforms
- Producing guardrails in tough erections
Desk OF Items PARAMETERS:
Area of Origin | EPTT |
Brand name Identify | EPTTRL |
Dimension | forty eight.3 /48.3 |
EPT StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | EN74/BS1139/AS1576.two |
Area Remedy | electro galvanizing /very hot dipped galvanization/self-coloration |
EPTT Detail | PVC baggage then on metal pallet |
Supply Detail | twenty-30 daEPTTafter deposit. |
Fundamental Elements | EPTT coupler, Swivel coupler, 50 % swivel, putlog coupler, sleeve coupler, board reXiHu (West EPT) Dis.Hu (West EPT) Dis. coupler, GirEPTTcoupler, joint pin,and many others. |
production | OEM ampODM |
Merchandise No. | Description | Dimension | WeigEPTT (kgs) |
SC001 | EPTT couplers | 48.3mm | one.05 |
SC002 | Swivel couplers | 48.3mm | 1.fifteen |
SC003 | 50 % swivels | 48.3mm | .sixty |
SC004 | putlog couplers | 48.3mm | .sixty three |
SC005 | EPTt pins | forty eight.3mm | one.00 |
SC006 | Sleeve couplers | 48.3mm | 1.ten |
SC007 | GirEPTTCoupler | 48.3mm | 1.forty five |
Manufacturing facility Photos:
Items Pictures:
CERTIFICATION
Buyer Checking out
Q1: Are you a manufacturing facility or trading organization?
A: We are a manufacturing facility EPTTizing in production all sorts of scaffolding substance.
Q2: In which is the loading port?
A: EPTTngdao port or TianEPTT port
Q3: What is the MOQ of the solution?
A: Different product has various MOQ. Normally one particular pallet is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TEPTTcertification.
Q5: Can I get some samples?
A: Sure, Sample is free, but generally the buyer will spend for the shipping and delivery EPT.
Q6: Do you have an OEM provider?
A: Yes. We can supply OEM and ODM services as your demands.
Q7: How EPTT is the generation cycle right after purchasing?
A: EPTT it is about twenty-thirty days.
Q8: What is the payment strategies?
A: T/T payment is desired and other payment phrases is approved.